For Immediate Release
West Parking Garage Expansion - Week 35 • Work on the Vertical Expansion and South Expansion continues o Level 7 – Level 4(West) are barricaded as Construction Zone only. o Front Street Exit/Entrance Closed Owner Work o Stair 1 & 2 barricaded above Level 4 for Construction o Stair 3 barricaded above Level 3 for Construction o Elevator 3 closed during Construction (Front Street Elevator) o Elevator 1 & 2 closed during Construction (Vine Street Elevators) • Vine Street Entrance for Battleship Tenants OPENED o South Side Exit to Convention Center Drive for Battleship Tenants CLOSED throughout September 1. Drive approaches for garage • Crane- Removed Here are the scheduled activities for the 35th week of Construction: 1. Install Elevator 1&2 2. Tie-in floor drains on South Expansion 3. Install conduit, pull wire, install lights 4. Elevator work in Tower 3- Final Adjustments 5. Brick/CMU Installation North Elevation 6. CMU installation Elevator #4/5 7. CMU installation South Side/East Side garage 8. Guardrail System Installation 9. Signage to continue 10. EIFS installation Tower #1 11. Roofing Stair #4 Roof 12. Window Installation 13. Traffic Coating and Striping 14. Painting 15. Finish pouring the remaining crashwalls
Contact:
Jennifer B. Davis Marketing & Communications Manager Greater Columbus Convention Center (614) 827-2538 |